Icon Published Date:

May 2, 2025
Results of Building Construction Work at Dailekh
सामाजिक विकास कार्यालय दैलेख
Icon
Dailekh
Source : Himalaya Nepali
Works
Icon     Awarded To:

IFB No : SDO/DLK/W/NCB/16/2081/082 || भैरवी कालिका निर्माण सेवा भैरवी गा.पा ५ दैलेख ( रु. ४८,६८,८४३.७५ )

Icon Published Date:

May 2, 2025
Results of Supply, Delivery, Installation, Testing and Commissioning for Water Vending Machine at Biratnagar
खानेपानी, सिंचाई तथा उर्जा मन्त्रालय, विराटनगर
Icon
Morang
Source : Himalaya Nepali
Goods Supply
Icon     Awarded To:

IFB No : MoWSIE-KP/DoIE/Goods/081-82/NCB-14 || New Anand Trade House Pvt. Ltd., Biratnagar ( 2,46,00,000.00 ) 

Icon Published Date:

May 2, 2025
Results of Building, Drain Construction And Other Works at Jumla
सघन सहरी तथा भवन निर्माण आयोजना, जुम्ला
Icon
Jumla
Source : Himalaya Nepali
Works
Icon     Awarded To:

IFB No : PUDBC/Jumla/Work/NCB/55-2081/082 || श्री डागि कन्स्ट्रक्सन त्रिपुरासुन्दरी ३ डोल्पा ( Nrs. 54,39,129.02 )
IFB No : PUDBC/Jumla/Work/NCB/56-2081/082 || श्री वरीक बुढालक्ष्मी निर्माण सेवा डोल्पा  ( Nrs. 11,62,041.40 )
IFB No : PUDBC/Jumla/Work/NCB/57-2081/082 || श्री झाक्री मप्ट कन्स्ट्रक्सन एण्ड ढुवानी सेवा डोल्पा ( Nrs. 57,02,976.76 )
IFB No : PUDBC/Jumla/Work/NCB/58-2081/082 || श्री रोमियो कन्स्ट्रक्सन चखेलि ३ हुम्ला ( Nrs. 79,16,714.35 )
IFB No : PUDBC/Jumla/Work/NCB/59-2081/082 || श्री किसान विल्डर्सं कोहलपुर न-पन १२ वाके ( Nrs. 51,32,025.51 )
IFB No : PUDBC/Jumla/Work/NCB/60-2081/082 || श्री जगदुल्ला कन्स्ट्रक्सन एण्ड सप्लायर्स प्रा.लि.डोसपा ( Nrs. 68,84,235.53 )
IFB No : PUDBC/Jumla/Work/NCB/61-2081/082 || श्री रोमियो कन्स्ट्रक्सन चंखैलि ३ हुम्ला ( Nrs. 75,53,466.12 ) 

Icon Published Date:

April 30, 2025
Results of Construction work, Procurement of Irrigation Pipe at Banke
राप्ती सोनारी गाउँपालिका, अगैया, बाँके
Icon
Banke
Source : Yug Aawhan National Daily
Works
Icon     Awarded To:

IFB NO : RSRM/WORKS/2081-082/20 || Bageshwori Kal Bhariav Construction Naubasta-08, Banke (RS.1,19,15,791.20/-)
IFB NO : RSRM/GOODS/2081-82/06 || Siddhababa Hardware Pvt.Ltd. Nepalgung-18, Banke (RS.16,96,424.18/-)

Icon Published Date:

April 30, 2025
Results of Wire pole installation work at Parsa
पटेर्वा सुगौली गाउँपालिका, पर्सा
Icon
Parsa
Source : Prakshepan Daily
Works
Icon     Awarded To:

IFB NO : 02/PSRMUN/NCB/WORKS/2081/082 || श्री सि.पी. ईन्टरनेशनल पावर एण्ड ईन्भेष्टमेन्ट कम्पनी प्रा. लि. (६७,५५,५५५।२६)

Icon Published Date:

May 2, 2025
Results of Water Supply Project Construction and Other Works at Sindhupalchwok
खानेपानी, उर्जा तथा सिंचाई मन्त्रालय, सिन्धुपाल्चोक
Icon
Sindhupalchok
Source : Sourya Dainik
Works
Icon     Awarded To:

IFB No : WSSD3/NCB/15/81/082 || M/S Gehendra/ J.B./Jugal JVKathmandu ( रु ३,४६,३७,७९६.४३/- ) 

Icon Published Date:

April 30, 2025
Results of Road maintenance work at Sankhuwasabha
पूर्वाधार विकास कार्यालय, संखुवासभा
Icon
Sankhuwasabha
Source : Prabhab Daily
Works
Icon     Awarded To:

IFB NO : IDOSANK/Works/NCB-18/2081/82 || M/S Sumit Mitra Construction, Koshi Rural Municipality-03, Sunsari (NRs. 37,66,602.70)

Icon Published Date:

May 1, 2025
Results of Water Supply Irrigation Project at Dang
बंगलाचुली गाउँपालिका, कमिरेचौर
Icon
Dang
Source : New Yougbodh Dainik
Works
Icon     Awarded To:

IFB NO : BRM/NCB/W/2081/082-17 || Om Nilaanjan Infratech Pvt. Ltd. (KMC-04, Kathmandu) (Nrs. 25,92,248.30)
IFB NO : BRM/NCB/W/2081/082-18 || Bhaktiyog Construction and Engineering Consulting Pvt. Ltd. (Madhyapur Thimi-09, Bhaktapur (Nrs. 26,49,408.67)
IFB NO : BRM/NCB/W/2081/082-19 || Monalisa Urmila Nirman Sewa Pvt. Ltd. (Bangalachuli-03, Dang) (Nrs. 23,31,607.33)
IFB NO : BRM/NCB/W/2081/082-20 || Bhaktiyog Construction and Engineering Consulting Pvt. Ltd. (Madhyapur Thimi-09, Bhaktapur) (Nrs. 29,45,970.56)

Icon Published Date:

May 1, 2025
Results of Road Construction Work at Kathmandu
तारकेश्वर नगरपालिका, काठमाडौं
Icon
Kathmandu
Source : Naya Patrika
Works
Icon     Awarded To:

IFB No : Tara/26/NCB/081-082 || Thapa Realestate and Construction company pvt.ltd ( रू. १५,९०,५५५.५२ ) 

Icon Published Date:

May 1, 2025
Results of Reconstruction work at Dadeldhura
अजयमेरु गाउँपालिका, भद्रपुर, डडेलघुरा
Icon
Dadeldhura
Source : Rajdhani
Works
Icon     Awarded To:

IFB NO : ARM/NCB/W-8/2081/82 || Reconstruction work of Ajayamerukot Durbar. (Nrs. 6192902.55)
IFB NO : ARM/NCB/W-6/2081/82 || Construction of Rajul Healthpost (Nrs. 2062379.50)
IFB NO : ARM/NCB/W-7/2081/82 || Construction of Letam DWSS. (Nrs. 2536578.65)

Icon Published Date:

May 1, 2025
Results of Building Construction Work at Dhading
धुनिवेशी नगरपालिका, धादिड
Icon
Dhading
Source : Karobar
Works
Icon     Awarded To:

IFB No : 32/WORKS/NCB/DM/2081/82 || उत्सब एण्ड ग्रिस्मा निर्माण सेवा नीलकण्ठ, धादिङ ( रु. २६, २५,९१९. ६४ )

Icon Published Date:

May 1, 2025
Results of Various Construction Work at Makwanpur
शहरी विकास तथा भवन कार्यालय मकवानपुर
Icon
Makwanpur
Source : Karobar
Works
Icon     Awarded To:

IFB No :  UDBO/MAK/NCB/WORKS/2081/82-38 ||Sahisa Nirman Sewa Pvt. Ltd, Khairahani-12, Chitwan ( Nrs. 1,13,72,544.89 )
IFB No :  UDBO/MAK/NCB/WORKS/2081/82-43 || Lalupate Builders, Hetauda-02, Makawanpur ( Nrs. 81,21,368.64 )
IFB No :  UDBO/MAK/NCB/WORKS/2081/82-44 || Mark Construction and Suppliers Pvt. Ltd., Banasthali-16, Kathmandu ( Nrs. 39,32,954.95 )
IFB No :  UDBO/MAK/NCB/WORKS/2081/82-45 || Elite Construction & Suppliers Pvt Ltd, Kathmandu 32  ( Nrs. 75,39,695.25 )
IFB No :  UDBO/MAK/NCB/WORKS/2081/82-46 || S. R. N. Dipika Construction Pvt. Ltd., Baneshwor. ( Nrs. 45,76,672.63 ) 
IFB No :  UDBO/MAK/NCB/WORKS/2081/82-47 || Grid Builder and Engineering, Dolakha ( Nrs. 14,56,166.33 )
IFB No :  UDBO/MAK/NCB/WORKS/2081/82-48 || Swichha Construction and Suppliers, Palungtar-1, Gorkha ( Nrs. 61,69,939.00 )
IFB No :  UDBO/MAK/NCB/WORKS/2081/82-49 || Quick Construction, Hetauda-04, Makawanpur ( Nrs. 52,20,000.00 )
IFB No :  UDBO/MAK/NCB/WORKS/2081/82-50 || S.P. Nirman sewa, Hetauda-18, Makawanpur ( Nrs. 28,98,504.15 )
IFB No :  UDBO/MAK/NCB/WORKS/2081/82-51 || Liyonel Construction Pvt. Ltd, Kathmandu ( Nrs. 38,27,973.85 ) 
IFB No :  UDBO/MAK/NCB/WORKS/2081/82-52 || Guna Nirman Sewa, Hetauda-11, Makawanpur ( Nrs. 43,25,830.59 )

Icon Published Date:

May 1, 2025
Results of Tubewell Construction and Installation of Pump and Accessories at Siraha
भूमिगत जलस्रोत तथा सिंचाई विकास डिभिजन, सिरहा
Icon
Siraha
Source : Janakpur Today
Works
Icon     Awarded To:

IFB No : GWIDDLHN/१-२०८१-८२(TW) || श्री डि.के. बिल्डर्स पकहा मैनपुर-८, पर्सा  ( रु. ४९,३९,४९३/०० )

Icon Published Date:

April 30, 2025
Results of Pipe Line Extension Work at Bara
नेपाल खानेपानी संस्थान, कलैया
Icon
Bara
Source : Rajdhani
Works
Icon     Awarded To:

IFB No : NWSC-KLY-01-2081-082(Re) || Suman Nirman Sewa Mahagadhimai Na.Pa .- 5,Bara ( Nrs. 17,21,028.00 )

Icon Published Date:

April 30, 2025
Results of BUILDING CONSTRUCTION, PROCUREMENT AND SUPPLY OF MEDICINE AND SURGICAL ITEMS AT ROLPA
सुनिलस्मृति गाउपालिका, सुलिचौर. रोल्पा
Icon
Rolpa
Source : Mission Today
Works
Icon     Awarded To:

IFB NO : SSRM-ROL-W-NCB-14-2081/082 || MISHRAN ENGINEERING CONSULTANCY & CONSTRUCTION PVT. LTD, SUNILSMRITI RURAL MUNICIPALITY-08, ROLPA (३७,३५,१९५.५०/-)
IFB NO : SSRM-ROL-W-NCB-15-2081/082 || ISHWAR NIRMAN SEWA, SUNILSMRITI RURAL MUNICIPALITY-04, ROLPA (२०,२५,३२२.००/-)
IFB NO : SSRM-ROL-G-SQ-19-2081/082 || NAYAN MEDICO PHARMA, MADHYAPUR THIMI MUNICIPLITY-01, BHAKTAPUR (७,३२,३०२.००/-)

Icon Published Date:

April 30, 2025
Results of Construction work at Bardiya
BARBARDIYA MUNICIPALITY, JAYANAGAR
Icon
Bardiya
Source : Mission Today
Works
Icon     Awarded To:

IFB NO : 29/BMO/NCB/W/2081/082 || जयगुरुदेव कन्स्ट्रक्शन, बारबर्दिया-९, बर्दिया (Nrs. 24,15,113/-)

Icon Published Date:

April 30, 2025
Results of Hall Construction work at Salyan
त्रिवेणी गाउँपालिका, लुहाम, सल्यान
Icon
Salyan
Source : Mission Today
Works
Icon     Awarded To:

IFB NO : 06/TRM/SLN/NCB/WORKS/081/82 || M/s Bhandari construction, Sharada-15, Salyan (Nrs. १२,१७,१२५.९८)

Icon Published Date:

April 30, 2025
Results of Building , Road Upgradation Works at Kapilvastu
बाणगङ्गा नगरपालिका, कपिलवस्तु
Icon
Kapilvastu
Source : Mission Today
Works
Icon     Awarded To:

IFB NO : 93/NCB/BMO/KAPIL/WORKS/81-82 || एम.डि निर्माण सेवा एण्ड सप्लायर्स प्रा.लि (रु. २१,३६,४६१/७५)
IFB NO : 103/NCB/BMO/KAPIL/WORKS/81-82 || रुद्रेश ड्रिलिन्न सप्लायर्स एण्ड कन्ट्रक्सन प्रा.लि (रु. ६३,४१,०४९/२३)
IFB NO : 104/NCB/BMO/KAPIL/WORKS/81-82 || लक्कि डिजाईनर्स एण्ड बिल्डर्स प्रा.लि (रु. ३१,०५,५३२।८२)
IFB NO : Re105/SQB/BMO/KAPIL/WORKS/81-82 || शिशिर वर्षा कन्ट्रक्सन प्रा.लि (रु. १०,९३,०३७।२०)
IFB NO : Re106/SQB/BMO/KAPIL/WORKS/81-82 || एम.डि निर्माण सेवा एण्ड सप्लायर्स प्रा.लि (रु. ४,५४,२९७/९२)
IFB NO : 108/SQB/BMO/KAPIL/WORKS/81-82 || लारी कन्ट्रक्सन (रु. ९,००,२२३।२७)

Icon Published Date:

April 30, 2025
Results of Road maintenance work at Rupandehi
बुटवल उपमहानगरपालिका, रुपन्देही
Icon
Rupandehi
Source : Mechikali
Works
Icon     Awarded To:

IFB NO : 32/081/082/Bsmc/Works/NCB || श्री प्रतिक प्रयोजन निर्माण सेवा प्रा.लि., सिद्धार्थनगर-६, रुपन्देही। (Nrs. 54,38,470|55)

Icon Published Date:

April 30, 2025
Results of Road, Park and other construction work at Arghakhanchi
शितगंगा नगरपालिका, ठाडा
Icon
Arghakhachi
Source : Mechikali
Works
Icon     Awarded To:

IFB NO : १४ (नि.१९)-२०८१/०८२ || सुवोध कन्स्ट्रक्सन (रु. १०९५०६६.९६)
IFB NO : ६६ (नि.३९)-२०८१/०८२ || क्षितिज कन्स्ट्रक्सन (रु. ४९०९८४२.५१)
IFB NO : ६७ (नि.४०)-२०८१/०८२ || जय मालारानी कन्स्ट्रक्सन (रु. ४८१९६३७.९१)
IFB NO : ६८ (नि.४१-२०८१/०८२ || सुवोध कन्स्ट्रक्सन (रु. ७४७९४२.३५)
IFB NO : ६९ (नि.४२)-२०८१/०८२ || डि एड पि कन्स्ट्रक्सन (रु. ४९५४२५६.९६)
IFB NO : ७० (नि.४३)-२०८१/०८२ || गिर्वानी निर्माण सेवा (रु. ५०३५ ४८५.३१)
IFB NO : ७१ (नि.४४)-२०८१/०८२ || धर्मराज निर्माण सेवा (रु. ४१८६९०१.६०)
IFB NO : ७२ (नि.४ ५)-२०८१/०८२ || गिर्वानी निर्माण सेवा (रु. ३३२१०१४.५७)

Icon Published Date:

April 30, 2025
Results of Road Upgrading Work at Okhaldhunga
सघन शहरी तथा भवन निर्माण आयोजना, ओखलढुंगा
Icon
Okhaldhunga
Source : Naya Patrika
Works
Icon     Awarded To:

IFB No : PUDBC/OKHALDHUNGA/WORKS/ NCB/2081/082-20 || SUNRISE-ULTRA JV, Hetauda 2 ( Nrs. 1,89,77,350.66 ) 

Icon Published Date:

April 30, 2025
Results of Building Construction Work at Saptari
शम्भुनाथ नगरपालिका, सप्तरी
Icon
Saptari
Source : Karobar
Works
Icon     Awarded To:

IFB No : 02T/NCB/Shmun/2081/082 || पूजा निर्माण सेवा सातदोवाटो ललितपुर १५ ( ४९,५९,८६४/६७ ) 

Icon Published Date:

April 30, 2025
Results of Road Upgradation Work at Dhankuta
सडक डिभिजन धनकुटा
Icon
Dhankuta
Source : Abhiyan
Works
Icon     Awarded To:

IFB No : RD/DKT/33701169/081/82/29 || Laxmi-Gokarna J.V, Bidur-01, Nuwakot ( Nrs. 40528564.11 )
IFB No : RD/DKT/33701169/081/82/30 || DC Construction, Katari, Udayapur ( Nrs. 34289121.85 )

Icon Published Date:

April 30, 2025
Results of Road Upgrading, Building and Art & Culture Museum Construction work at Rukum(west)
मुसिकोट नगरपालिका, रुकुम (पश्चिम)
Icon
Rukum West
Source : Jana Sawal
Works
Icon     Awarded To:

IFB NO : NCB/MM/Ruk.W/W.1S1E_081/082/10 || M/S Rukum K.R.P Construction Musikot 12 (Nrs. 32,09,114.03)
IFB NO : NCB/MM/Ruk.W/W.1S1E_081/082/11 || M/S Rukum K.R.P Construction Musikot 12 (Nrs. 28,16,388.26)

Icon Published Date:

April 30, 2025
Results of Construction for Depth PD Tubewell & Installation of Submersible Pump at Chitwan
Groundwater Resources & Irrigation Development Division Parsa, Khairahani, Chitwan
Icon
Chitawan
Source : Chitawan Post
Works
Icon     Awarded To:

IFB NO : NCB13/081/082(PDTW-12) || Bhawani Drilling and Construction PVL Ltd., Bharatpur 01, Chitwan (Nrs. 15,44,850.00)
IFB NO : NCB14/081/082(PDTW-13) || Bhawani Drilling and Construction PVL Ltd., Bharatpur 01, Chitwan (Nrs. 15,71,550.00)
IFB NO : NCB15/081/082(PDTW-14) || Bhawani Drilling and Construction Pvt. Ltd., Bharatpur 01, Chitwan (Nrs. 16,38,600.00)

Icon Published Date:

April 30, 2025
Results of View Tower Coloring, Water supply & Foot path construction work at Dhankuta
धनकुटा नगरपालिका, धनकुटा
Icon
Dhankuta
Source : Blast Khabar
Works
Icon     Awarded To:

Concept Architect and Designs, Kathmandu (Nrs. 32,25,586|11)

Icon Published Date:

April 30, 2025
Results of Supply for Panel LED smart boaed stand, sound system, laptop and printer at Makwanpur
नगर कार्यपालिकाको कार्यालय मकवानपुर
Icon
Makwanpur
Source : Madhyanha
Works
Icon     Awarded To:

IFB No : THAHA/SEQ/GOODS/04/2081/82 || Ultimate Easy Solution Nepal Pvt Ltd. ( Nrs. 18,53,765.00 ) 

Icon Published Date:

April 30, 2025
Results of Road and Drain, Hall construction work at Saptari
पूर्वाधार विकास कार्यालय, सप्तरी
Icon
Saptari
Source : Nepal Samacharpatra
Works
Icon     Awarded To:

IFB NO : IDO/Saptari/Works/NCB/36-081/82 || M/s Bajarangbali Construction, Lohajara, Saptari, Nepal. (रु.४७,३५,००६.५३)

Icon Published Date:

April 30, 2025
Results of Building Construction work at Sarlahi
हरिवन नगरपालिका, सर्लाही
Icon
Sarlahi
Source : Nepal Samacharpatra
Works
Icon     Awarded To:

IFB NO : HM/WORK/NCB-11/2081/082 || Rohan Engineering And Builders Pvt.Ltd, lalbandi-07 Sarlahi Nepal (Npr.88,98,582.4)

Icon Published Date:

April 30, 2025
Results of Road Construction work at Lamjung
Madhyanepal Municipality, Bhorletar, Lamjung
Icon
Lamjung
Source : Sourya Dainik
Works
Icon     Awarded To:

IFB NO : MNM/NCB/81/82/W/05 || Construction of Pakhurichowk Rambazaar(Dhalkeaap-Ghumti Section) Road , Madhyanepal-6, Bhorletar, Lamjung (Nrs. 68,78,091.80)

Icon Published Date:

April 30, 2025
Results of Civil construction work at Saptari
खडक नगरपालिका, कल्याणपुर, सप्तरी
Icon
Saptari
Source : Sourya Dainik
Works
Icon     Awarded To:

IFB NO : KHDK/W/NCB/14/081/82 || Saakshi Radha Nirman Sewa, Khadak-10, Saptari, (रु. ३३,३९,४१८।७३)
IFB NO : KHDK/W/NCB/15/081/82 || Saakshi Radha Nirman Sewa, Khadak-10, Saptari, (रु.३२,९१,५३२।६८)

Icon Published Date:

April 30, 2025
Results of Procurement for Fabricated Steel Parts at Dailekh
पूर्वाधार विकास कार्यालय, दैलेख
Icon
Dailekh
Source : Sourya Dainik
Goods Supply
Icon     Awarded To:

IFB NO : IDO/Dailekh/TB/GOODs/NCB/01-081/082 || S.K Engineering Industries, Butwal. (Nrs. 7919855.69)

Icon Published Date:

April 30, 2025
Results of Road And Building Construction Work at Chitwan
सघन शहरी तथा भवन निर्माण आयोजना चितवन
Icon
Chitawan
Source : Himalaya Nepali
Works
Icon     Awarded To:

IFB No : PUDBC/CHITWAN/NCB/WORKS/76/081/082 || Puspanjali Builders, Chitwan ( Nrs. 74,01,630.34 ) 
IFB No : PUDBC/CHITWAN/NCB/WORKS/77/081/082 || Puspanjali Builders, Chitwan ( Nrs. 37,89,664.23 )

Icon Published Date:

April 30, 2025
Results of Civil Construction Work at Kaski
संघीय शहरी विकास तथा भवन निर्माण कार्यालय, कास्की
Icon
Kaski
Source : Himalaya Nepali
Works
Icon     Awarded To:

IFB No : FPIW/KASKINCB/WORKS/081/82/80 || M/S Ghale Construction and Suppliers Pvt. Ltd., Ngisyaing Rural Municipality-01,
Manang. ( Nrs. 79,02,369.00 ) 

Icon Published Date:

April 30, 2025
Results of Boundary Wall and Earth Filling Construction Work at Rupandehi
जिल्ला समन्वय समितिको कार्यालय, रुपन्देही
Icon
Rupandehi
Source : Himalaya Nepali
Works
Icon     Awarded To:

IFB No : DCC/NCB/Works/01-081/82 || Rajan Nirman Sewa, Bagaha-2,Rupandehi ( Nrs. 65,99,663.35 )

Icon Published Date:

April 30, 2025
Icon
Kathmandu
Source : Gorakhapatra
Works
Icon     Awarded To:

IFB NO : NCB/10/PROSEC/2081/82 || M/S Mahavir Shree International Pvt. Ltd., Sinamangal, Kathmandu (NRs. 17,82,752/)
IFB NO : NCB/16/PROSEC/2081/82 || M/S Mahavir Shree International Pvt. Ltd., Sinamangal, Kathmandu (NRs. 26,51,761/)

Icon Published Date:

April 30, 2025
Results of Renovation for Warehouse with partition Works at Kathmandu
खाद्य व्यवस्था तथा व्यापार कम्पनी लिमिटेड, काठमाडौं
Icon
Kathmandu
Source : Gorakhapatra
Works
Icon     Awarded To:

IFB NO : FMTCL/SKT/NCB/WORKS-081/082-01 || श्री लविका विल्डर्स प्रा.लि. साफेबगर न.पा .- १३, अछाम प्रो. सावित्री ठकुल्ला (रु.२४,१७,२२४/-)

Icon Published Date:

April 30, 2025
Results of Rehabilitation for HDPE Transmission Main at Kathmandu
काठमाण्डौ उपत्यका खानेपानी लिमिटेड, त्रिपुरेश्वर
Icon
Kathmandu
Source : Gorakhapatra
Works
Icon     Awarded To:

Nepa Construction, Baghdole, Lalitpur (रु.१३,१३,३२६.००)

Icon Published Date:

April 30, 2025
Results of Building Construction work at Kathmandu
काठमाडौं महानगरपालिका, कमलादी
Icon
Kathmandu
Source : Gorakhapatra
Works
Icon     Awarded To:

IFB NO : 03-03-081-82-NCBW-HTD-KMC || Orbit Engineering and Builders, Gokarneshwor, Kathmandu (रु १,८७,६७,३१८/६०)

Icon Published Date:

April 30, 2025
Results of Building Construction Works at Surkhet
नेपाल टेलिकम, वीरेन्द्रनगर
Icon
Surkhet
Source : Gorakhapatra
Works
Icon     Awarded To:

IFB NO : NDCL/PDSKT/NCB/Works-01/081-82 || Bajranga Nirwan Sewa,Chandannath-05, Jumla (NPR. 2,18,52,580.78)

Icon Published Date:

April 30, 2025
Results of Rehabilitation and Protection for Water Source at Kathmandu
KATHMANDU UPATYAKA KHANEPANI LIMITED, MAHARAJGUNJ
Icon
Kathmandu
Source : Gorakhapatra
Works
Icon     Awarded To:

IFB NO : (KUKL/MAHARAJGUNJ/NCB/01/2081-82) || Subarna Nirman Sewa, Hima-1, Jumla (Nrs. 39,03,200.00)

Icon Published Date:

April 30, 2025
Results of House Renovation work at Lalitpur
नेपाल प्रशासनिक प्रशिक्षण प्रतिष्ठान, जावलाखेल
Icon
Lalitpur
Source : Gorakhapatra
Works
Icon     Awarded To:

IFB NO : (NASC/SQ/Works-03/081/82) || P.N.B. Builders and Suppliers Pvt. Ltd. (रु. १३,८९,८४३।५०)

Icon Published Date:

April 30, 2025
Results of Supply, Installation for of CCTV Cameras at Dhanusa
गृह, सञ्चार तथा कानुन मन्त्रालय, जनकपुरधाम
Icon
Dhanusa
Source : Gorakhapatra
Goods Supply
Icon     Awarded To:

IFB NO : MoHCL/NCB/CCTVJHK/2081-082/31 || Synergy I.T Solutions Pvt.Ltd. New Baneshwor-10, Kathmandu (रु. १,१३,८४,६४५।-)

Icon Published Date:

April 30, 2025
Results of Boundary Wall and Temple Construction work at Kathmandu
पशुपति मित्र माध्यमिक विद्यालय, चाबहिल कामपा-७, काडमाडौं
Icon
Kathmandu
Source : Gorakhapatra
Works
Icon     Awarded To:

IFB NO : 01-01-081-082-NCBW-PMSS || Sapana and Swikriti Construction Pvt.Ltd. (रु. ३०,९४,४६६।१३)

Icon Published Date:

April 30, 2025
Results of Water supply irrigation at Kathmandu
Nepal Electricity Authority, Durbarmarg
Icon
Kathmandu
Source : Gorakhapatra
Goods Supply
Icon     Awarded To:

IFB NO : KGA-2081/82-TM-13 || श्री गोर्खाली सप्लायर्स,बिदुर-८, नुवाकोट (रु. ६७,१२,२००/००)
IFB NO : MMHPS-2081/82-MT-05 || श्री नेपाल हाइड्रो एण्ड इलेक्ट्रिक लि., बुटवल, रुपन्देही (रु. ३५,७०,२३५/००)

Icon Published Date:

April 30, 2025
Results of Road Pavement, Drain, Park Construction and Road Upgradation Work at Kathmandu
शहरी विकास तथा भवन कार्यालय, काठमाडौं
Icon
Kathmandu
Source : Aarthik Dainik
Works
Icon     Awarded To:

IFB No : UDBO/KTM/WORKS/NCB/38-81/82 // Panchatatva Construction Pvt Ltd, Koteshwor ( Nrs. 4257970.28 ) 
IFB No : UDBO/KTM/WORKS/NCB/40-81/82 // Janak Nirman Sewa, Arghakhanchi ( Nrs. 4391496.28 ) 
IFB No : UDBO/KTM/WORKS/NCB/43-81/82 // Newa Innovative Engineering Consultant & Construction Pvt Ltd, Baneshwor-10 ( Nrs. 2177550.26 ) 

Icon Published Date:

April 30, 2025
Results of Building Construction Work at Sindhuli
घ्याडलेख गाउँपालिका, सिन्धुली
Icon
Sindhuli
Source : Aarthik Dainik
Works
Icon     Awarded To:

IFB No : GHRM/Sindhuli/Works/NCB/05/2081/082 // Lucky One Builders and Suppliers Pvt Ltd Kamalamai -5,Milanchowk ( Nrs. 27,50,725.98 )

Icon Published Date:

April 30, 2025
Results of Supply for School Bags at Kathmandu
नेपाल दूरसञ्चार कम्पनी लिमिटेड, भद्रकालीप्लाजा
Icon
Kathmandu
Source : Gorakhapatra
Goods Supply
Icon     Awarded To:

IFB NO : NDCL/CCO/SQ-BSM-03/081-82 || श्री वेरिजोन ट्रेडर्स जनकपुरधाम, धनुषा (रु.३९,६६,३००।-)

Icon Published Date:

April 30, 2025
Results of Water Supply Project Work at Butwal
संघीय खानेपानी तथा ढल व्यवस्थापन आयोजना, बुटवल
Icon
Rupandehi
Source : Aarthik Dainik
Works
Icon     Awarded To:

IFB No : FWSSMP/BTL/NCB/W/08/081-82 // प्रशंशा कन्सट्रक्सन, मार्तडी -४, बाजुरा (  रु. ११,६१,८७,७७७,७५ ) 
IFB No : FWSSMP/BTL/NCB/W/13/081-82 // दियालो टेक्निलोजिज प्रा.लि., का.म.न.पा .- ३२, काठमाडौ ( रु. २९,४९,९४९.७५ )

Icon Published Date:

April 30, 2025
Results of Supply and Delivery for Drug at Sarlahi
हरिवन नगरपालिका, सर्लाही
Icon
Sarlahi
Source : Aarthik Dainik
Goods Supply
Icon     Awarded To:

IFB No : HM/GOODS/ SQ-02/2081/082 // Suhashi Medico Pharma Kathmandu,Nepal ( Npr. 4,10,400.00 ) 