Filter
Icon Published Date:

Aug. 19, 2025
Icon
Ilam
Source : Aarthik Dainik
Works
Icon     Works:

IFB No : RDILAM/337310113/082/83-04(Re) || Recurrent Maintenance Works along Harkate to Fikkal Section of Mechi Highway (Ch 71+000 to Ch 80+000), Fikkal Pashupatinagar Road(Ch 0+000 to Ch 3+500 and
Ch 7+500 to Ch 10+750), Fikkal- Shree Antu-Chabbise Road (Ch 02+000 to Ch 15+000) ( Est Amt Nrs. 22,22,296.37 )
IFB No : RDILAM/337310113/082/83-06(Re) || Recurrent Maintenance along Puwa Khola- Ranke-Phidim Section (Ch 129+000 to Ch 150+000, Ch 172+000 to Ch 54,55,938.97 177+000) and Jorsal -Tamor Section (Ch 0+000 to Ch 9+000) of Mechi Highway ( Est Amt Nrs. 54,55,938.97 )

Icon Published Date:

Aug. 19, 2025
Tender/Quotation of Service for Revenue Tax Collection at Dolakha
बैतेश्वर गाउँपालिका
Icon
Dolakha
Source : Aarthik Dainik
Services
Icon     Works:

IFB No : BRM/NCB/GoodsRevenue/01/2082/083 || क्षेत्र नं क (ठूलोबगर क्षेत्र २७०३६'५७" उत्तर ८६०४'३१" पूर्व र काँडेबगर क्षेत्र २७४०'२" उत्तर ८६०६'०३" पूर्व) ( रु. २९,९३,६४०/- )
IFB No : BRM/NCB/Goods-Revenue/022082/083 || क्षेत्र नं ख (मर्याङ बगर क्षेत्र २७०३७'२८"उत्तर ८६०४'५१" पूर्व, सती बगर क्षेत्र २७०३७'४५" उत्तर ८६०४'५८" पूर्व, बिमिरे बगर क्षेत्र २७०३८'२७" उत्तर ८६०५'०५" पूर्व) ( रु. १५,०६,७००/- )
IFB No : BRM/NCB/Goods-Revenue/032082/083 || क्षेत्र नं ग (सिम्ले बगर क्षेत्र २७४०'५०" उत्तर ८६०६'२१" पूर्व, मलेपु बगर क्षेत्र २७०४०'५५" उत्तर ८६०६'३९" पूर्व, कोलुड्गे बगर क्षेत्र २७०४१'०३" उत्तर ८६०७'०७" पूर्व) ( रु. ७३,५४,४२५/- )
IFB No : BRM/NCB-Goods-Revenue/042082/083 || क्षेत्र नं घ (महभिर बगर क्षेत्र २७४०'१५" उत्तर ८६०५'४२" पूर्व) ( रु. ६२,२४,४००/- )

Icon Published Date:

Aug. 19, 2025
Tender/Quotation of Service for Revenue Tax Collection at Dolakha
बैतेश्वर गाउँपालिका
Icon
Dolakha
Source : Aarthik Dainik
Services
Icon     Works:

IFB No : BRM/NCB/GoodsRevenue/01/2082/083 || क्षेत्र नं क (ठूलोबगर क्षेत्र २७०३६'५७" उत्तर ८६०४'३१" पूर्व र काँडेबगर क्षेत्र २७४०'२" उत्तर ८६०६'०३" पूर्व) ( रु. २९,९३,६४०/- )
IFB No : BRM/NCB/Goods-Revenue/022082/083 || क्षेत्र नं ख (मर्याङ बगर क्षेत्र २७०३७'२८"उत्तर ८६०४'५१" पूर्व, सती बगर क्षेत्र २७०३७'४५" उत्तर ८६०४'५८" पूर्व, बिमिरे बगर क्षेत्र २७०३८'२७" उत्तर ८६०५'०५" पूर्व) ( रु. १५,०६,७००/- )
IFB No : BRM/NCB/Goods-Revenue/032082/083 || क्षेत्र नं ग (सिम्ले बगर क्षेत्र २७४०'५०" उत्तर ८६०६'२१" पूर्व, मलेपु बगर क्षेत्र २७०४०'५५" उत्तर ८६०६'३९" पूर्व, कोलुड्गे बगर क्षेत्र २७०४१'०३" उत्तर ८६०७'०७" पूर्व) ( रु. ७३,५४,४२५/- )
IFB No : BRM/NCB-Goods-Revenue/042082/083 || क्षेत्र नं घ (महभिर बगर क्षेत्र २७४०'१५" उत्तर ८६०५'४२" पूर्व) ( रु. ६२,२४,४००/- )

Icon Published Date:

Aug. 19, 2025
Icon
Ilam
Source : Aarthik Dainik
Works
Icon     Works:

IFB No : RDILAM/337310113/082/83-1 || 
1. M/s Shankar Trishakti Nirman Sewa, Ilam
2. M/s Maibhagawati- Indrajit JV, Ilam 
3. Maibhagawati Nirman Sewa Pvt. Ltd., Ilam Indrajit Construction, Ilam
IFB No : RDILAM/337310113/082/83-02 || 
1. M/s Shankar Trishakti Nirman Sewa, Ilam
2. M/s Luminious- Anshu JV, Ramechhap
3. Luminious Construction, Ramechhap
4. Anshu Builders, Kathmandu

Icon Published Date:

Aug. 18, 2025
Icon
Kathmandu
Source : PPMO/EGP
Consultancy EOI
Icon     Works:
IFB No: EGP/ICB/EOI/02-2025/26
The DPR aims to develop a comprehensive plan for DICL’s iron ore mining and integrated steel production by assessing and validating geological resources, estimating reserves and ore value, conducting metallurgical tests, and designing optimal mining, processing, and steel manufacturing facilities. It will cover site selection, waste management, technology choice, process flows, infrastructure, transportation, and raw material sourcing, while defining organizational and manpower requirements. The study will include market analysis, machinery and equipment recommendations, and detailed financial and economic evaluations with realistic pricing and investment models. It will also address by-product utilization, knowledge exchange, and project phasing with clear implementation and procurement strategies to ensure technical, economic, and environmental viability.
Icon Published Date:

Aug. 18, 2025
Icon
Surkhet
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 01-082/083
Asphalt Pavement Work
Icon Published Date:

Aug. 18, 2025
Icon
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 01/Works/NCB/KM/082/083
Chapagaudi Dhekhi Bungkhola Hudai Serbas Sadak Strounnati, Kalika-08 as per Technical Specifications.
Icon Published Date:

Aug. 18, 2025
Icon
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 02/Works/NCB/KM/082/083
Construction of road Ward no 4 ra 5 ko Simana sadak Bi. Pi. Chowk Dekhi Uttar Padampur Samudayik Ban sadak Kalopatre Woda No 4 Ra 5 as per Technical Specifications.
Icon Published Date:

Aug. 18, 2025
Icon
Nawalparasi
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 03/GM/NCB/2082-83
Upgrading of different roads of ward 6,9,10,11,14,15 and 17 located in Gaindakot Municipality
Icon Published Date:

Aug. 18, 2025
Icon
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 03/Works/NCB/KM/082/083
Construction of Samipur School Building, Kalika 1 as Per Drawing and Technical Specifications
Icon Published Date:

Aug. 18, 2025
Icon
Nawalparasi
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 04/GM/NCB/2082-83
Construction of Rigid Pavement Road at Bijaya Chowk Nagartandi of Gaindakot Municipality-14, Nawalpur(East)
Icon Published Date:

Aug. 18, 2025
Icon
Surkhet
Source : PPMO/EGP
Works
Icon     Works:
IFB No: IDD/SKT/W/NCB/01/082-083
Upgrading of Gangate Aarantuda Dhadkhet Thal Jajarkot Sadak (Dhadkhet -Thal Jajarkot Section).
Icon Published Date:

Aug. 18, 2025
Icon
Surkhet
Source : PPMO/EGP
Works
Icon     Works:
IFB No: IDD/SKT/W/NCB/02/082-083
Construction of Surkhet Vally Ring Road, Birendranagar Surkhet,
Icon Published Date:

Aug. 18, 2025
Icon
Surkhet
Source : PPMO/EGP
Works
Icon     Works:
IFB No: IDD/SKT/W/NCB/04/082-083
Construction of Bihani Tole & Mitratole Link Aapkholi Bridge Birendranagar-5, Surkhet
Icon Published Date:

Aug. 18, 2025
Icon
Surkhet
Source : PPMO/EGP
Works
Icon     Works:
IFB No: IDD/SKT/W/NCB/05/082-083
Construction of Duikholi Rokaya Tole,Tule Galmare Kalekunda Chanardera Dimra Road, Chingad -3, Surkhet.
Icon Published Date:

Aug. 18, 2025
Icon
Surkhet
Source : PPMO/EGP
Works
Icon     Works:
IFB No: IDD/SKT/W/NCB/06/082-083
Construction of Kandapokhari Awalgandra Khaneta Road, Chingad -2, Surkhet
Icon Published Date:

Aug. 18, 2025
Icon
Surkhet
Source : PPMO/EGP
Works
Icon     Works:
IFB No: IDD/SKT/W/NCB/07/082-083
Construction of Khoriya Road, Birendranagar -12, Surkhet
Icon Published Date:

Aug. 18, 2025
Icon
Surkhet
Source : PPMO/EGP
Works
Icon     Works:
IFB No: IDD/SKT/W/NCB/08/082-083
Construction of Kalika Mandir To Baidya Danda Sadak, Birendranagar-5, Surkhet
Icon Published Date:

Aug. 18, 2025
Icon
Surkhet
Source : PPMO/EGP
Works
Icon     Works:
IFB No: IDD/SKT/W/NCB/09/082-083
Ashphalt Concrete Works
Icon Published Date:

Aug. 18, 2025
Icon
Surkhet
Source : PPMO/EGP
Works
Icon     Works:
IFB No: IDD/SKT/W/NCB/10/082-083
Asphalt Pavement and Drain Work
Icon Published Date:

Aug. 18, 2025
Icon
Surkhet
Source : PPMO/EGP
Works
Icon     Works:
IFB No: IDD/SKT/W/NCB/12/082-083
Ashphalt Concrete Works
Icon Published Date:

Aug. 18, 2025
Icon
Kaski
Source : PPMO/EGP
Works
Icon     Works:
IFB No: RCIP-AF/Gandaki/Works/OCB-16/2082/83
Asphalt concrete works, retaining wall works, gabion works, slab culvert works, humepipe culvert works, drain works etc.
Icon Published Date:

Aug. 18, 2025
Icon
Nawalparasi
Source : PPMO/EGP
Goods
Icon     Works:
IFB No: 01/DEV/NCB/GOODS/2082-083
Procurement and Supply Of Medicine and Related Accesories items at Devchuli Municipality,Office Of Municipal Executive Nawalparasi(East) For FY 2082-083
Icon Published Date:

Aug. 18, 2025
Icon
Solukhumbu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 02/NCB/WORKS/ROAD/KPLRM/2082-83
Chyading Tole Branch Road Upgrading and Sewage Treatment.
Icon Published Date:

Aug. 18, 2025
Icon
Doti
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 03-RDDOT/2082/083-12
Roadway Excavation and Structure Works along Jorayal-Sahajpur Road, Doti.
Icon Published Date:

Aug. 18, 2025
Icon
Doti
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 03-RDDOT/2082/083-13
Roadway Excavation and Structure works along Gaira-Gankhet-Aalital Road, Dadeldhura.
Icon Published Date:

Aug. 18, 2025
Icon
Doti
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 03-RDDOT/2082/083-14
Roadway Excavation and Structure Works along Daiji-Jogbudha-Chirkitte-Dadeldhura-Belapur-Bajhang Road, Dadeldhura
Icon Published Date:

Aug. 18, 2025
Icon
Doti
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 03-RDDOT/2082/083-15
Roadway Excavation and Structure Works Along Kalagad-Chhadimandu-Mudbhara Road, Doti.
Icon Published Date:

Aug. 18, 2025
Icon
Doti
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 03-RDDOT/2082/083-16
Roadway Excavation and Structure Works Along Talkot-Dhurkot Road, Sikhar NaPa, Doti.
Icon Published Date:

Aug. 18, 2025
Icon
Doti
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 03-RDDOT/2082/083-17
Bridge and Culvert Protection Works along Seti highway and Silgadhi-Chaukhutte Road.
Icon Published Date:

Aug. 18, 2025
Tender/Quotation of Namche Haat Bazar Management
Khumbu Pasanglhamu Rural Municipality, Solukhumbu
Icon
Solukhumbu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 03/NCB/WORKS/BLDG/KPLRM/2082-83
Namche Haat Bazar Management
Icon Published Date:

Aug. 18, 2025
Icon
Dhankuta
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 03/RDDKT/337310113/082/83-08
Recurrent Maintenance Works at Hile-Guranse & Basantapur - Deurali(DB) Road section.
Icon Published Date:

Aug. 18, 2025
Icon
Dhankuta
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 03/RDDKT/337310113/082/83-09
Recurrent Maintenance Works at KRM (Leguwa- Kewabesi) road section.
Icon Published Date:

Aug. 18, 2025
Tender/Quotation of Ngotungla-Tate Road Track Opening Work.
Khumbu Pasanglhamu Rural Municipality, Solukhumbu
Icon
Solukhumbu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 04/NCB/WORKS/ROAD/KPLRM/2082-83
Ngotungla-Tate Road Track Opening Work.
Icon Published Date:

Aug. 18, 2025
Icon
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 07/Works/NCB/Kmun/082/83
Construction of Different road at different ward of Khairahani-2,3,4,5 and 8
Icon Published Date:

Aug. 18, 2025
Icon
Banke
Source : PPMO/EGP
Goods
Icon     Works:
IFB No: 1/RSRM/2082-83
Rapti Sonari Antargat Parne Bibhinna 6 ota Ghatharu (Muguwa-Daxin, Tikulipur Ghat, Sijaniya/Samsergunj Ghat, Bagdaila Ghat, Paruwa Khola Ra Jhijhari Khola Ghat) ko Nadinajya Padarthako Ekmusta Thekka.
Icon Published Date:

Aug. 18, 2025
Icon
Syangja
Source : PPMO/EGP
Goods
Icon     Works:
IFB No: 12/PM/NCB/GOODS/082/83
Sadak Batti Samagri Kharid Putalibazar Nagarpalika
Icon Published Date:

Aug. 18, 2025
Icon
Banke
Source : PPMO/EGP
Goods
Icon     Works:
IFB No: 2/RSRM/2082-83
Rapti Sonari Antargat Parne Bibhinna 6 ota Ghatharu (Jalala Ghat, Khalala Tapri Ghat, Jangpur SAipur Ghat, Sinabas Nayabsti Ghat, Nawalpur Ghat and Alinagar/Chachafarka Ghat)ko Nadinajya Padarthako Ekmusta Thekka.
Icon Published Date:

Aug. 18, 2025
Icon
Kathmandu
Source : PPMO/EGP
Goods
Icon     Works:
IFB No: KUKL/NCB/01/082/083
The Procurement of Refilling and Supply of Liquid Chlorine
Icon Published Date:

Aug. 18, 2025
Icon
Kathmandu
Source : PPMO/EGP
Goods
Icon     Works:
IFB No: MoD-2082-083-bid-1
Supply of office goods and materials for fiscal year 2082/083 as mentioned in the bid data sheet
Icon Published Date:

Aug. 18, 2025
Icon
Kathmandu
Source : PPMO/EGP
Goods
Icon     Works:
IFB No: MoFA_NC-NCB-01-2082/83
Procurement of Diplomatic Mail Service
Icon Published Date:

Aug. 18, 2025
Icon
Kaski
Source : PPMO/EGP
Works
Icon     Works:
IFB No: MRM/NCB/W02/082-083
Karpudanda Tourism Infrastructure Construction at Madi RM-2 and 3
Icon Published Date:

Aug. 18, 2025
Icon
Kaski
Source : PPMO/EGP
Works
Icon     Works:
IFB No: MRM/NCB/W03/082-083
Construction Of saimarang Health Post at Madi RM-11
Icon Published Date:

Aug. 18, 2025
Icon
Kaski
Source : PPMO/EGP
Works
Icon     Works:
IFB No: MRM/NCB/W04/082-083
Construction and Upgrading Of Yankjakot -Togi-Warchowk-Bhachowk-Nagidar-Poshi Perkyu Sadak at Madi R.M-3
Icon Published Date:

Aug. 18, 2025
Icon
Kaski
Source : PPMO/EGP
Works
Icon     Works:
IFB No: MRM/NCB/W05/082-083
Construction and Upgrading Of Bhagwati-Khimaje-warchowk (bhagwati-Lamtari) Road at Madi RM-11
Icon Published Date:

Aug. 18, 2025
Icon
Jhapa
Source : PPMO/EGP
Works
Icon     Works:
IFB No: NCB/JHAPA/JRM/WORKS/01/082-83
Barpipal Chowk dekhi Simalbari Jholunge Pul samma sadak kalopatre (Ch 0+000-1+263.189)
Icon Published Date:

Aug. 18, 2025
Icon
Jhapa
Source : PPMO/EGP
Works
Icon     Works:
IFB No: NCB/JHAPA/JRM/WORKS/02/082-83
Sangam Chowk dekhi purwa sukumbasi hudai border samma sadak kalopatre (Ch 0+000-0+340)
Icon Published Date:

Aug. 18, 2025
Icon
Jhapa
Source : PPMO/EGP
Works
Icon     Works:
IFB No: NCB/JHAPA/JRM/WORKS/03/082-83
Hulaki Sadak Uttar Simaldagi dekhi Madarsha samma ra panthapada jodne kalopatre samma ra nafil ko ghar dekhi misbahul ulum madarsha samma sadak kalopatre (Ch 0+000-0+350)
Icon Published Date:

Aug. 18, 2025
Icon
Jhapa
Source : PPMO/EGP
Works
Icon     Works:
IFB No: NCB/JHAPA/JRM/WORKS/04/082-83
Durga Chowk dekhi hanuman chowk samma sadak kalopatre (Ch 0+000-1+420)
Icon Published Date:

Aug. 18, 2025
Icon
Source : PPMO/EGP
Works
Icon     Works:
IFB No: NCB/MMO/W/03/2082-83
Construction of Black Top Road from Ncell tower to Shivdwar-diwanagar & Raitole Via Kalyanpur.