IFB NO : BAKUNAPA/NCB/WORKS-03-2081/82 || Construction of Kupinde lake Infrastructure
IFB NO : BAKUNAPA/NCB/WORKS-02-2081/082 || Construction of School Building Dipendra Pra. Vi. kauchhe.
IFB NO : NA/19BDE/NCB/WORKS/081/82/04 || Construction of Brigade level office(G+1)
IFB NO : BAKUNAPA/NCB/WORKS-01-2081/82 || Construction of School Building Bheri Aa. Bi. Garha
IFB NO : UGR/NCB/MAN-02/081-82 || The Work consist of Dam construction including with Culvert, Gabion wall and causeway.
IFB NO : UGR/NCB/MAN-01/081-82 || The Work consist of Upgrading of road that includes Stone Masonry wall, Gravelling flexible pavement and Rigid pavement works.
IFB NO : HRM/NCB/W/R/02/081/082 || Construction of Single Cell Box Slab Culvert at harinas Rural Municipality, Birta Ward -06,This road Connect harinas Rural Municipality and Chapakot Municipality,Syangja
IFB NO : PSMUN/NCB/WORKS/2081/082-05 || Ward No 10 Tribeni Chowk Dekhi Shanischare Bazar jane Sadak Kalopatre 2081-82
IFB NO : SGNHC/ICB/081/82/14 || Supply And Delivery Of Vascular Sheath
IFB NO : BRM/081/82/WORKS/08 || Tindobato Patnekhola Bagane Jatrephedi Road
IFB NO : TJVCL/ICB/081-82/EM-HM-01 || Lot 2 Electromechanical and Hydromechanical Works of Upper Trishuli 3B Hydroelectric Project (37 MW)
IFB NO : IFB/04h/UDB-RUP/081-82 || Construction of Ramsamujh samudayik adhuro bhawan nirman,Mayadevi-07,Kapilvastu
IFB NO : NCB/BRM/WORKS/001/2081-82 || Upgrading and maintenance of rural road
IFB NO : MMSI/WORKS/NCB/2081-82/03 || Upgrading Works Of Bhotechaur-Thulopata-Fusromata-Giranchaur-sindhukhola Road.
IFB NO : 10/BM/RD/2081/82 || Rangai gaunko dakshin tol jane sadak,taaku transformer dekhi asaram tharuko ghar hudai jholunge pul sadak and Dubiya tal tol jane adhuro sadak
IFB NO : 9/BM/RD/2081/82 || Badalpura Gaun Dekhi Purba Tol Jane Adhuro Sadak And Badalpura Purvtole Main Bato PCC Dhalan Tatha Nali Nirman
IFB NO : NCB/BRM/WORKS/002/2081-82 || Upgrading of rural road
IFB NO :
BRM/081/82/WORKS/07 Chyasingkharka Health Post Building Construction
IFB NO : PSMUN/NCB/WORKS/2081/082-04 || Pulchowk Bhategauda Sadak kalopatre 2081-82
IFB NO : KRM/NCB/Works/Dolakha/04/2081/82 || Upgrading of katuwa chaur,chihan dada,basnet gaun,loteping,bhatere chaur sadak
IFB NO : 8/BM/RD/2081/82 || Imiliya Ma Vi Hudai Maitahawa Sadak Nirman Buddhabhumu-09
IFB NO : BRM/081/82/WORKS/06 || Bhugdeu Bajar Road
IFB NO : 134/65/081-82 || Upgrading of Work
IFB NO : Rmun/NCB/Works/09/2081/82 || Bibhinna Sadak Marmat, Ratuwamai-08
IFB NO : NCB/BRM/WORKS/006/2081-82 || Upgrading of rural road
IFB NO : IFB/04f/UDB-RUP/081-82 || Construction of Drain from shankarpur to bal bahira,Si.na.pa-10,Rupandehi
IFB NO : Bhjmun/W/NCB/06-2081/82 || Construction of 10 No. Ward Office Building, Bhaisipankha, Bhojpur Municipality-10, Bhojpur
IFB NO : Rmun/NCB/Works/08/2081/82 || Blacktop of Itahara Bajar Purba Katnu Jane sadak
IFB NO : PRM/ILAM/WORK/NCB/02/081/082 ||,Construction Of Veterinary Hospital Building
IFB NO : NCB/BRM/WORKS/003/2081-82 || Upgrading of rural road
IFB NO : BRM/081/82/WORKS/05 || Chyamrangbesi Ratankhola Jhinge Sukumphedi Chyangchyang Khola Road
IFB NO : 134/64/081-82 || Upgrading of Work
IFB NO : BRM/081/82/WORKS/05 || Chyamrangbesi Ratankhola Jhinge Sukumphedi Chyangchyang Khola Road
IFB NO : KRM/NCB/Works/Dolakha/03/2081/82 || Upgrading of Bhatere chaur,pokhari chaur, loteping sadak dhalan Section 1) thulo khola thulo sim causeway dhalan Section 02) chire khola gabion wall tatha marmat,Thumka pipalbot gabion wall nirman Section 03)
IFB NO : 134/64/081-82 || Upgrading of Work
IFB NO : NCB/SRM/06/081-82 || Construction Of Black Topped Road From Bangai-Rajad-Pakadi,ward 5
IFB NO : IFB/04b/UDB-RUP/081-82 || Construction Work of Road From Dubauli-Pokharabari to Belbas Bethari Sadak at Butwal-18,Rupandehi
IFB NO : IFB/04b/UDB-RUP/081-82 || Construction Work of Road From Dubauli-Pokharabari to Belbas Bethari Sadak at Butwal-18,Rupandehi
IFB NO : IFB/04b/UDB-RUP/081-82 || Construction Work of Road From Dubauli-Pokharabari to Belbas Bethari Sadak at Butwal-18,Rupandehi
IFB NO : BRM/081/82/WORKS/04 || Tipchowk Parthali Road
IFB NO : KRM/NCB/Works/Dolakha/02/2081/82 || Upgrading of Campus dhamire sadak(section 1) ,Ghangkhola Ganeshmandir Tilahar Sadak(Section2) ,Chakarpu Malepu Krishi Sadak(section3) ,Dhamire Sakhalpu sadak(section4) , Pipalbot Krishi Sadak(section5) ,Pipalbot Jalkini Sadak(section6) ,Makaibari Sadak(section 07) ,Malepu Sadak(section 08 )and Mildanda Odakarlaya Kalinag Mavi Sadak (section 09)
IFB NO : 134/63/081-82 || Upgrading of Work
IFB NO : NCB/SRM/05/081-82 || Construction Of Black Topped Road from Manpakadi-Kunwari-babhani danda,Shuddodhan 5
IFB NO : NCB/BRM/WORKS/004/2081-82 || RCC frame structure Building
IFB NO : IFB/04g/UDB-RUP/081-82 || Construction of road ,drain slab and kerb stone at bardahawa village,Kapilbastu-02,Kapilvastul
IFB NO : OIRM/GUL/NCB/081/82-08 || Providing and laying granular sub-base on prepared surface, mixing at OMC, and compacting to achieve the desired density.
IFB NO : NCB/SRM/04/081-82 || Construction of Blacktopped Road From sisaughari -Butwal Sub. Metropolitan city Border,ward 2
IFB NO : KRM/NCB/Works/Dolakha/01/2081/082 || Upgrading of Gumukhola -Syaule -Pokhare -Bhadaure- Kattike Sadak,Ward no 07
IFB NO : BAR/NCB/Works/06/081/82 || Bardaghat Nagarpalika Bhawan Marmat, Rangarogan tatha Canteen Nirman, Bardaghat-04
IFB NO : RMUN/NCB/Works/06/2081/82 || Two, Three and four phase line
© Copyright Thekkabazar. All Rights Reserved