Works:
IFB NO : HEDNPJ/SQ/GOODS/06/2082-083 || मालसामान खरिद मेशनरी औजार (पार्टपुर्जा) (रु. ५०००0/-)
Works:
IFB NO : PACSPP/G/SQ-03/082-083 || Procurement Supply, Delivery and installation of Machinery for Provincial Ayurved Ausadhi Utpadan Kendra (Bid sec. amt. 50000.00)
Works:
IFB NO : PMWH/NCB/54/2082/083 || OT Table (रु. ५१,८९०/-)
IFB NO : PMWH/NCB/55/2082/083 || OT Light (रु. ५०,७२९/-)
IFB NO : PMWH/NCB/56/2082/083 || Sluicing Machine (रु. ५४,८११/-)
Works:
IFB NO : DORW/RTB/02/2070/071 || Construction of Railway Track Bed of Simra Bardibas Sector of MMERP (Ch 79+600 to 80+500)
1. श्री महालक्ष्मी/हिरा एण्ड नमिता जे.भी., काठमाडौं
Works:
IFB NO : DROPKR/3371234/073-074/124 || Roadway Extension Structures and Blacktop (Premix carpet) at Begnas Tal Aananda Jyoti Mavi road, Kaski
1. श्री लामा बिल्डर्स कम्पनी प्रा.लि. काठमाडाँ
Works:
IFB NO : 11/081-082/NCB/WORKS/RT/WIEDO-JAJARKOT || Construction & Protection of Landslide Works (River Training Works at Different Places) at Jajarkot.
1. रमित कन्स्ट्रक्सन, कुशे-०५, जाजरकोट
Works:
IFB NO : (CAAN/CNAD/SQ-01/082/83) || Supply, Delivery and Testing of UHF Walkie-Talkie Sets and Accessories for Domestic Airports
Works:
IFB NO : UNDP/RFP/20/2026 (UNDP-NPL-00676) || Technical support in establishing, strengthen and operationalize web-based agriculture information management system in eleven (11) municipalities and review and reformulation of agriculture resilient plan in three (3) municipalities
IFB NO : UNDP/RFP/21/2026 (UNDP-NPL-00679) || Water Resistivity Survey and Pump Test Assessment for Selected Solar Drinking Water and Irrigation Sites
IFB NO : UNDP/RFQ/2026/18 (UNDP-NPL-00677) || Repair and Improvement of Footpaths at UN House
Works:
IFB NO : LIDPO/SKT/IFB/B/DB/NCB/2082/83/1 || Design and Construction of Batulle Sarugaad Motarable Bridge,Kushe Ward 5 &6, Jajarkot
IFB NO : LIDPO/SKT/IFB/MB/W/NCB/2082/83/1 || Construction of Motorable Bridge at Chauragaun Gaibara Khola, Patarasi Rural Municipaliy-03, Jumla
IFB NO : LIDPO/SKT/IFB/MB/W/NCB/2082/83/2 || Construction of Pre-Stressed Concrete Bridge over Gochhe Khola Connecting Pokhara and Thakleni, Surkhet, Gurbhakot Municipality-4
IFB NO : LIDPO/SKT/IFB/MB/W/NCB/2082/83/3 || Construction of Pre-Stressed Concrete Bridge over Ranka Khola, Tatopani Rural Municipality Ward No. 1, Jumla
IFB NO : LIDPO/SKT/IFB/MB/W/NCB/2082/83/4 || Construction of Field Arch Bridge over Ruga Khola and Tarandeu Khola, Sinja-6, Jumla
Works:
1. Automatic Kjeldahl System with 20 test sample with complete setup
2. UV Spectrophotometer Single Beam
3. Trinocular Microscope with HD Camera and Display screen
4. Moisture Analyzer Digital
Works:
1. Prahari Chauki Bhawanma truss tatha chana lagaune karya,Dharan-16
2. Govinda road pul samrakshan tatha slab nirman karya,Dharan-7
© Copyright Thekkabazar. All Rights Reserved