Works:
IFB NO : BDP/GOODS/ICT/2/081/82 || Supply, delivery and installation of E-attendance and CCTV camera.
Works:
IFB NO : BDP/GOODS/ICT/2/081/82 || Supply, delivery and installation of E-attendance and CCTV camera.
Works:
IFB NO : BRM/SQ/WORKS/004/2081/082 || Construction of first floor for School at Bagmati-09
Works:
IFB NO : SRM/SQ/W/13-2081/082Re || Kallabari Mabi Gherabar (compound wall )
Works:
IFB NO : UDBO/DANG/Works/10(c)-2081/82 || Construction of Road and Drain works etc
Works:
IFB NO : 69/DSMC/2081/082 || Construction of Remaning works at Library Block of Sanatan Hindu Dharma Education Committee Ward No. 13 DSMC
Works:
IFB NO : SRM/SQ/W/12-2081/082Re || Gomsiwa Thegalaghiu Road (stone soling paving work)
Works:
IFB NO : 57/DSMC/2081/082 || Construction of Blacktop Road from ward office to Najariya Road at Ward No. 06 DSMC
Works:
IFB NO : SRM/SQ/W/11-2081/082Re || Rangashala Chhahare Road (stone soling pavement work, earthen drainage work)
Works:
IFB NO ; 58/DSMC/2081/082 || Construction of Blacktop Road at Ward No. 07 DSMC
Works:
IFB NO : 58/DSMC/2081/082 || Construction of Blacktop Road at Ward No. 07 DSMC
Works:
IFB NO : IDOSYANGJA/SQ/W/R/31/081/82 || Upgrading of Thuli Bhanjyang Aangwang Jimire Parbat Sadak, Bhirkot 9
Works:
IFB NO : 69/DSMC/2081/082 || Construction of Remaning works at Library Block of Sanatan Hindu Dharma Education Committee Ward No. 13 DSMC
Works:
IFB NO : IDOSYANGJA/SQ/W/R/35/081/82 || Upgrading of Bhalu Pahad- Phapharkhet Sadak Sudhar , Putalibazar 4
Works:
IFB NO : 56/DSMC/2081/082 ||| Construction of Blacktop Road on the way of Ashok Pant House at Ward No. 06 DSMC
Works:
IFB NO : PRIAMC/G/SQ/01-081-82 || Supply and Delivery of Laptop Desktops, Printers, Projectors and Big Display.
Works:
IFB NO : IDOSYANGJA/SQ/W/R/34/081/82 || Upgrading of Aadhikhola GaPa 1 Panchamulko Arghaudi Sirubari Sadak
Works:
IFB NO : DWRI/IFSCQP/081/82/EOI-01 | | SN Particular Description 1 Project Name EIA Study of Kailali ground water irrigation project, Kailalii District 2 Location Dhangadhi Sub-metropolitan city ward numbers 18, 19, 14, 15, 17, 12, 7, 16, Kailari Rural Municipality all Wards, Gauriganga Urban Municipality Ward 1, 2, 3, 4, 5, 7, 8, 9, 11, in Kailali district, Sudurpaschim Province. 3 Source of Water Groundwater Well 4 Type Deep Tube well 5 Well Depth 100m to 200m 6 Well Size 250/150mm 7 Pump Type Electrical Powered Submersible Pump 8 Each Well Discharge 30-40lps 9 Number of Wells 380 10 Net Command Area 15000ha 11 Each Pumping Well Commands 40 ha 12 Distribution Systems uPVC Buried Pipe with Butterfly Outlets. 13 Total Project Cost NRs: 7,16,17,00,000 (with VAT), NRs: 6,36,43,18,055 (without VAT) 14 Cost Contribution GON: Rs. 7031485484 WUG: Rs. 13,02,14,516 15 Cost per hectare NRs: 477447 16 Incremental Benefit NRs. 1,52,000/ha/annum 17 Crop Intensity Present: 155%, 18 Internal Rate of Return 22.71% 19 Benefit Cost Ratio @ 10% Discount Rate:2.31 @ 15% Discount Rate:1.57 20 Ethnic Composition Tharu 56%, Hill Bahun-Chhetri 27%, Dalit: 10%, Others: 7% 21 Literacy Rate: 60%
Works:
IFB NO : NIMO/NCB-04/2081-82 || Construction, Repair and Maintenance of Irrigation canal and canal structures at different locations of Block 6
Works:
IFB NO : IDOSYANGJA/SQ/W/R/45/081/82 || Upgrading of Zero Majuwa Kamakhya Sadak Kalopatre, Arjunchaupari 1,2 Ra 3
Works:
IFB NO : UDBO/Morang/SQ/Works/76-2081/82 || Tallo Bengri Dekhi Mathillo Bengri Samma Pakhrindanda Hundai Dhairi Sarswati Bhantabari Sadak, Triyuga-16 , Udayapur
Works:
IFB NO : IDOSYANGJA/SQ/W/R/44/081/82 || Upgrading of Khadkako Padhera Aapko Rukh Kol Hudai Giri Kul Mandirsamma Motor Bato Nirman (Adhuro Kaam)
Works:
IFB NO : UDBO/Morang/SQ/Works/75-2081/82 || Khanitar Kopche Dilliwar Bhalebas Limchungbung Halesi Sadak Staronnati, Rautamai-07, Udayapur
Works:
IFB NO : IDOSYANGJA/SQ/W/R/43/081/82 || Upgrading of Khasadekhi Ghurpal Pakki Sadak, Chapakot NaPa
Works:
IFB NO : UDBO/Morang/SQ/Works/74-2081/82 || Majhuwa Banpal Kawribot Churunfa Sadak Staronnati, Udayapurgadhi 4 & 8 , Udayapur
Works:
IFB NO : UDBO/Morang/SQ/Works/73-2081/82 || Bhate Bhanjyang Magwari Sadak Staronnati, Limchungbung-1 , Udayapur
Works:
IFB NO : IDOSYANGJA/SQ/W/R/42/081/82 || Upgrading of Dhobadi Archanbas Rangbhang Sadak, Biruwa-3
Works:
IFB NO : IDOSYANGJA/SQ/W/R/41/081/82 || Upgrading of Lamaswara Dekhi Kumerdung Sadak, Biruwa 7 Syangja
Works:
IFB NO : IDOSYANGJA/SQ/W/R/40/081/82 || Upgrading of Pasu Karyalaya- Kajiman Haritika MaBi Hudai Godgode Sadak, Putalibazar 3
Works:
IFB NO : IDOSYANGJA/SQ/W/R/39/081/82 || Upgrading of Khoriya - Jhakridulo Paryatakiya Kendra Jodne Sadak, Putalibazar 2
Works:
IFB NO : IDOSYANGJA/SQ/W/R/38/081/82 || Upgrading of Simalbhanjyang-Kirako Khor- Upretthar-Thuladihi Sadak, Putalibazar 3
Works:
IFB NO : IDOSYANGJA/SQ/W/R/37/081/82 || Upgrading of Sepat Badhunga Arghadi Narikot Rimalswara Kothi Panchase, Aandhikhola 4
Works:
IFB NO : IDOSYANGJA/SQ/W/R/36/081/82 || Upgrading of Harinas Jungle Maduli Chautari, Balikot, Putaligaiha Deurali Hudai Kalawa Basandanda Sadak Harinas-5
Works:
IFB NO : WIEDO/MUGU/WORKS/NCB/01/081/82 || construction of Khaddhyanna tatha Posan Nyunatapurti ka Lagi Khanepani thata Sichai Aayojana Soru RM-1,2 ( Gulma ISp Soru RM-01,02, Gothi ISP Soru RM-01,02 , Gard Panare to Gau Jiula ISP Soru RM-02,& Utari khola Chor Kulo ISP Soru RM 01,02), Mugu District
Works:
IFB NO ; NEA/BAJ/2081/082-ST-05 || HT/LT Line Construction and Transformer Installation at Masta Ga. Pa. 4 Bhatekhoa to 2 Baadegau and Masta 6 rilu to 7 Thagunna
Works:
IFB NO : FUDBCO/SURKHET/WORKS/NCB/7f/081/82 || Construction of Samudayik Bhawan Narayan Municipality 3 Dailekh
Works:
IFB NO : FUDBCO/SURKHET/WORKS/NCB/7e/081/82 || Upgrading of Radi Bazar -Buspark- batala gaun to maidada sadak,aathbiskot Municipality 9 Rukum West
Works:
IFB NO : FUDBCO/SURKHET/WORKS/NCB/7c/081/82 || Upgrading of Aulgurta fumda khati gurta to Siun sadak Nalgaad -13, Jajarkot
Works:
IFB NO : FUDBCO/SURKHET/WORKS/NCB/7a/081/82 || Construction of Janahit aadharbhut School Building, Musikot-3, Rukum west
Works:
IFB NO : NEA/BAJ/2081/082-ST-04 || HT/LT Line Construction and Transformer Installation at Khaptad Chhanna Ga. Pa., 4 Khatribada to 5 Matuwa, Patadewal
Works:
IFB NO : UDBO/MAK/NCB/WORKS/2081/82-19 || Construction of Asphalt Concrete Road, Stone Masonry Retaining Wall and Interlocking Block Works at Various Places at Ratnanagar-10,11,13 and 15, Chitwan
Works:
IFB NO : FUDBCO/Surkhet/Work/NCB/32/081/82 || Road Upgradation Works
Works:
IFB NO : 07-081-82 || Construction of Panchakoshi Bed Bidhyaashram Building at Dullu Municipality ward no 10 Dailekh.
Works:
IFB NO : FUDBCO/Surkhet/Work/NCB/31/081/82 |||Road Upgradation Works
Works:
IFB NO : WIEDO/WORKS/NCB/05/081/82 || Khatyad Khola tatbandhan
Works:
IFB NO : 01-IDOKAN/081/82-04 || Bedkot Na.Pa.6 wada office ot ghursuwa hudai wada No 7 Jane Sadak, Bedkot.Na.Pa. 6 and 7, Kanchanpur
Works:
IFB NO : FUDBCO/SURKHET/WORKS/NCB/7/081/82 || Infrastructure Development Works in Chaurjahari Municipality Rukum West (1. Upgrading of Khaichine Mokshyabari Mandir sadak & Khahare 2. Thadashing- olidera- ratadada-thapakandh- malame simal to Salyan Neta Road , Chaurjahari Municipality ,Rukum West)
Works:
IFB NO : 01-IDOKAN/081/82-03 || Mahakali Tol Jayanand Marga dekhi Shiddhanath Mandir Samma Sadak, Bhi.Na.Pa.10, Kachanpur
Works:
IFB NO : 01-IDOKAN/081/82-01 || Bedkot Na.Pa.7 and 8 ko Simana dekhi Mahakali D Block Samma Sadak BlackTop Works Bedkot Na.Pa. 7 and 8, Kanchanpur
Works:
IFB NO : IOM-EB-E1-8182 || Supply, Installation and Commissioning of Integrated Research Lab Setup
© Copyright Thekkabazar. All Rights Reserved