Works:
IFFB NO : SORU/MUGU/SQ/04/2081-082 || Procurement, Supply and Delivery of Medicine and Drugs at Sorukot,Mugu
Works:
IFB NO : BM/LIGHT/081/82/SQ-1 ||
Works:
IFB NO : BM/LIGHT/081/82/SQ-1 ||
Works:
IFB NO ; 06/SQ/G/ARM/MYAGDI/2081-82 || Procurement of Fabricated Steel Parts for Trail Bridges
Works:
IFB NO : 05/SQ/W/ARM/MYAGDI/2081-82 || Naaka Aaladada Motorbato Nirman
Works:
IFB NO : 21/081-82/BSMC/WORKS/NCB || Maintenance of Black Topped Road, Tick Drain and Road P.C.C at Hariyali Path, Shivalaya Path and Shiva Path, Butwal - 13, Rupandehi
Works:
IFB NO : WECS/06/2081-82 || Conducting interactive stakeholder workshop for dissemination of the River Basin Plans
Works:
IFB NO : PHLMC/KP/G/SQ-06/081-82 Procurement of Hemophilia Medicine.
Works:
IFB NO : 03/LRM/W/NCB/2081-082 ||| Construction of Hot Room at Ward no 1 office,Dhuk,Thingar,Namgyal,Kimling ,Chungjung and Lomanthang
Works:
IFB NO : 02/LRM/W/NCB/2081-082 || Khet Taar Baar and Gate Construction
Works:
IFB NO : PNP/W/NCB/05/081-82 || Solar fencing construction work
Works:
IFB NO : KUKL/LTR/NCB-02/081/082 || Supply and Installation of 110 mm dia HDPE pipeline extension work at LMC 14, Shivabasti Marga to Buddha Marga
Works:
IFB NO : GOODS/NCB/13/081/82/WSSD1/Makawanpur || Supply and Delivery of GI pipes at Makawanpur
Works:
IFB NO : KUKL/LTR/NCB-03/081/082 || Supply and Installation of 160 mm,110 mm,90 mm and 63 mm dia HDPE Pipeline extension work at LMC -15 Ullens school to Dhapakhel
Works:
IFB NO : KUKL/LTR/NCB-07/081/082 || 90 mm dia Pipeline extension work from Harit colony to boje pokhari,LMC 8 and Balkumari bridge LMC-9.
Works:
IFB NO : SCN/M/204000114/2081/082/02 || Supply and Delivery of Laptop (256 Units)
Works:
IFB NO : SCN/M/204000114/2081/082/01 || Supply and Delivery of Desktop Computer (210 Units)
Works:
IFB NO : KUKL/LTR/NCB-08/081/082 || Supply and Installation of 250 mm dia and 100 mm dia DI Pipeline from Sainbu WST to Ward 18 office Bhaisepati
Works:
IFB NO ; KUKL/LTR/NCB-05/081/082 || Supply and Laying of 90 mm and 63 mm dia HDPE pipe at LMC 26 Chokhel
Works:
IFB NO : TDO/NCB/W/22/2081/082 || Braham sthan ko Mandir Nirman,Shree Ramjanki math ko Compaund wall Nirman,Baba Bhuweneswarnath Astjam ghar Nirman,Madhavnaryan na.pa-7,Gaur na.pa-7,Durgabhagwati-7
Works:
IFB NO : KUKL/LTR/NCB-01/081/082 || Supply and Installation of 250 mm dia and 100 mm dia DI Pipeline from ward no 18 office to Magar gaun
Works:
IFB NO : TDO/NCB/W/21/2081/082 || Kabir Math Antargat Bhue Dhalan Karya,Braham Sthan ma Compaund Wall,Hanuman Mandir Nirman karya,Maulapur Na.pa
Works:
IFB NO : PKBSMUN/NCB/WORK/2081/082-06 || Construction of Infrastructure work at Khatri danda- Raitol -Ram Sita Mandir Premises in Pakhribas-8, Dhankuta
Works:
IFB NO : LIDPO/PKR/IFB/WORKS/13/81-082-149 || V.C. Marga (Chandrawati Galechhap to Bayalpani Bhanjang Road) Road Upgradation
Works:
IFB NO : TDO/NCB/W/19/2081/082 || Shiv Mandir Nirman Bibah Mandap ko compaund wall nirman,Khap Adhuro Radhakrishna Mandir Nirman,Paroha Na.pa-6, 4- Laukaha,9-Rampur
Works:
IFB NO : SRM/NCB/GKGS-04/2081/82 || Construction of Gajari Kurcheneta Garje Sigas Jadibuti Pahuch Marg Sadak Nirman
Works:
IFB NO : 38-BMC/081/082/W/NCB/66 || Blacktopped Road Construction in Different Toles of BMC-7
Works:
IFB NO : GOODS/NCB/12/081/82/WSSD1/Makawanpur || Supply and Delivery of HDPE pipes (PE 100 series and NS40:2079 compliance) Makawanpur
Works:
IFB NO : CM/NCB/GOODS/05/2081/82 || Supplying of 15 mm Volumetric Type Water Meter and HDPE Pipes for Chandragiri Municipality, Balambu, Kathmandu
Works:
IFB NO : AM/NCB/WORKS/16-081/82 || Construction of Drain, Footpath and Asphalt Concrete Road on Mahananda Chowk-Matamandir Road, Arjundhara-06
Works:
IFB NO : CM/Works/NCB-10/2081/82 || Construction of Tribhuwan Park and Upgrading Works at Chandragiri Municipality ward-04, Thankot,Kathmandu.
Works:
IFB NO : DORDI/NCB/W/02/081/082 || Roadway Excavation, Plum wall, Drainage, PCC for RCC, Stone Soling, base, prime, tack, premix etc at different chainages of Belghari Nauthar Sera Nayabasti Sadak Staronnati wherever necessary mainly maintainence of road.
Works:
IFB NO : DORDI/NCB/W/02/081/082 || Roadway Excavation, Plum wall, Drainage, PCC for RCC, Stone Soling, base, prime, tack, premix etc at different chainages of Belghari Nauthar Sera Nayabasti Sadak Staronnati wherever necessary mainly maintainence of road
Works:
IFB NO : CRM-WORKS/06/2081-82 || Construction of Slope Protection and River Training Works for Buspark and City Hall Building at Chame Rural Municipality, Manang
Works:
IFB NO : 03/TGDB/NCB-WORKS/2081/082 || Construction of Cottage and Community Cultural Museum Building at Tara Gaon Resort Hotel Kakani, Nuwakot
Works:
IFB NO : TRM/W/NCB/06/2081/082 || Woda Karyalaya Bhawan Woda No.11
Works:
IFB NO : TDO/NCB/W/15/2081/082 || Kailashpuri Hariwan Paryatikiya Chhetra Purwadhara Bikash ,Hariyon Na.Pa-6,Sarlahi
Works:
IFB NO : BM/BUILDING/NCB/07/2081/082 ||
Works:
IFB NO : 17/SM/NCB/Road/2081/082 || Construction of blacktop Ring Road Phase XI,shivasatakshi 09
Works:
IFB NO : BM/BUILDING/NCB/06/2081/082 || Shree Nepal Rastiya Adharbhut Bidhayalaya, Laukhat, Barahathwa-12, Sarlahi
Works:
IFB NO : BM/BUILDING/NCB/06/2081/082 || Shree Nepal Rastiya Adharbhut Bidhayalaya, Laukhat, Barahathwa-12, Sarlahi
Works:
IFB NO : 17/081-82/BSMC/WORKS/NCB || Re-Construction of Black Topped Road with Side Surface Drain, Shanti Path, Butwal - 08, Rupandehi
Works:
IFB NO : BM/BUILDING/NCB/04/2081/082 || Construction Of Shree Adharbhut Bidhayalaya, Hajariya, Barahathwa-1, Sarlahi
Works:
IFB NO : 17/081-82/BSMC/WORKS/NCB || Re-Construction of Black Topped Road with Side Surface Drain, Shanti Path, Butwal - 08, Rupandehi
Works:
IFB NO : BM/ROAD/NCB/03/2081/082 || Sadak Board Nepal Ko Saaje Darimaa Barahathwa Nagarpalika Purano Bank Chok Dekhi Hajariya Jaane Sadak Kalopatre Marmat Sambhar Starunatti Karye
Works:
IFB NO : RCIP/PIU-1/Jhapa-01/2081/082 || This road connects the Biratnagar-Itahari Road (Highway) Nimuwa to Koshi Nahar of Budhiganga Rural Municipality and is an access road to East West Highway . The total length of the proposed road is 7.5 km, where upgrading section length is 0.668 km. The alignment starts at Koyalpur chowk (Ch 22+263) and passes through settlement . The road section is proposed to be upgraded from graveled road to blacktop standard with improvement in horizontal and vertical alignment. The road described above is designed for all weather access with general roadway width of 6.50 m along with 5 m blacktopped (Asphalt Concrete) carriageway including 0.75 m Graveled shoulder on either side. The Summary Description of the main works is as follows: a. Scarifying of existing bituminous surface, and existing sub-base/base; b. Laying of sub-base, base and Asphalt concrete; c. Road marking
Works:
IFB NO : NRB/GOODS/NCB/01/081/82 || The Procurement of Desktop Computer (Branded) – 109 Sets (81/82)
Works:
IFB NO : TDO/NCB/W/16/2081/082 || Kalapani dekhi Viewtowet Jane Paidal Marg Nirman,Warda Karyalya mathi Braham Istan tatha Paidal sardak Interlocking block Nirman,Chandrapur-3, Rautahat
Works:
IFB NO : RIDO/DANG/SQ/W/22/081/082 || Kalimati Upallo Chowk Dekhi Kalika Mandir hudai Sahare Khola Ko Dam Samma Road Upgrading,Ghorahi-2
Works:
IFB NO ; CMIMO/WMC/CICRS/SQ-VI/2081-82 ||| Construction and Improvement of Canal and Related Structures at EMC of CMIS at WMC from U/S of VC-3 HR From Ch: 5+090m
© Copyright Thekkabazar. All Rights Reserved