IFB No: NWSC-JLR-06-2080/081 || Construction of Boundary Wall
IFB No: 08/NWSCHEMJA/WORKS/PKG1/080-81 || Construction of Package I Components of the treatment plant includes Receiving Chamber, Mixing Weir, Flocculator, Sedimentation Tank, Access Road and Drain Management works etc
IFB No: IMEP/Sankhuwasabha/B-1a/CW-21 || Construction of Canal and canal related Structures of Pangma Khola Badareni Irrigation Sub Project, Khadbari- 7,8, Sankhuwasabha (IMEP)
IFB No: IMEP/Sankhuwasabha/B-1a/CW-20 || Construction of canal and canal related of Kenwa Khola Fituwa Malibheg Irrigation Sub Project, Dharmadevi-09, Sankhuwasabha
IFB No: HDC-SOL-W-HDCBC-01/2080-81 || Himal Darsan Campus Building Construction Works ( RS. 51,38,101.00)
IFB No: BMC/NCB/WORKS/2077/078/23 || Construction of Ward Office Building at Ward No. 8 || S.D. Construction, Janakpur 14
IFB No: BMC/NCB/WORKS/2077/078/24 || Construction of Ward Office Building at Ward No. 15 || S.D. Construction, Janakpur 14
IFB No: BMC/NCB/WORKS/2077/078/25 || Construction of Ward Office Building at Ward No. 16 || S.D. Construction, Janakpur 14
IFB No: BMC/NCB/WORKS/2077/078/26 || Construction of Ward Office Building at Ward No. 24 || S.D. Construction, Janakpur 14
IFB No: BMC/NCB/WORKS/2077/078/27 || Construction of Ward Office Building at Ward No. 28 || S.D. Construction, Janakpur 14
IFB No : HDC-SOL-W-HDCBC-01/2080-81 || Himal Darshan CampusHimal Darshan Campus
IFB No : BPKIHS/080/081/66 || IUI Kit Sperm Separation Midea handing
IFB No : BPKIHS/080/081/67 || Cath Lab Consumables
IFB No : 08/NWSCHEMJA/WORKS/OKG1/080-81 || Construction of Treatment Plant in Hemja
IFB No : 1/081/082 ||| निकासी कर सङ्कलन
IFB No : २/081/082 ||| हाटबजार कर सङ्कलन
IFB No : ३/081/082 ||| कवाडी कर सङ्कलन
IFB No : ४/081/082 ||| साप्ताहिक हाटबजार कर सङ्कलन
IFB No : ५/081/082 ||| साप्ताहिक हाटबजार कर सङ्कलन
IFB No : ६/081/082 ||| हाटबजार कर सङ्कलन
IFB No : ७/081/082 ||| साप्ताहिक हाटबजार कर सङ्कलन
IFB No : ८/081/082 ||| खसी बोका केन्कद्रर बाट कर सङ्कलन
IFB No : 1/081/082 ||| सिटिहल भाडा
IFB No : NWSC-JLR-06-2080/081 Construction of Boundary Wall
IFB No : 94-BMC/80/81/G/NCB/128 || Installation for CCTV System With VMS Works
IFB No : IMEP/ Dhankuta /B-1A/CW-19 || Construction/ rehabilitations of Rindovane Ketabari Irrigation Sub Project
IFB No : IMEP/ Dhankuta /B-1A/CW-18 || Construction/ rehabilitations of Birendra kulo Irrigation Sub Project
IFB No : BH/NCB/WORKS/49/ 2080/081 || Construction of OPD Void NUrssing Faculty Room &Lab
IFB No : IMEP/ Sakhuwasabha /B-1A/CW-20 || Construction/ rehabilitations of Kenwa Khola Fitywa Malibheg Irrigation Sub Project
IFB No : IMEP/ Sakhuwasabha /B-1A/CW-21 || Construction/ rehabilitations of Pangma Khola Badareni Irrigation Sub Project
IFB No : IMEP/ SindhuPlanchok/B-1A/CW-51 || rehabilitations of Mahadev Khola Sineghari Dittiya I Irrigation Sub Project
IFB No : IMEP/ SindhuPlanchok/B-1A/CW-52 || rehabilitations of Mahadev Khola Sineghari Dittiya I Irrigation Sub Project
IFB No : NEA-LPDON-HR-2080/081-10 || Supply of Human Resources
IFB No : CW-38/080/081-01 || Construction of Headworks and Canal related structure of Gagan Irrigation Sub Project, Sukhipur, Siraha
IFB No : L-95/2080/081 || neurosurgery electric drill
IFB No : CW-018 || Rehabilitation of Birendra Kulo Irrigation Sub Project that includes reshaping of the existing canal, construction of structures like side intake, cross drainage works, village road bridges, simple fall structures, HDPE Pipe and RCC canal lining.
IFB No : CW-019 || Rehabilitation of Tindovane Kerabari Irrigation Sub Project that includes reshaping of the existing canal, construction of structures like side intake, cross drainage works, village road bridges, simple fall structures, HDPE Canal and RCC canal lining.
IFB No : NRB/GOODS/NCB/03/080/81 || Supply Delivery and Installation of Air Conditioner 26 Set
IFB No : Re-KGB-2080/081-SQ-01 || Partition Works AT office khimti Grid Branch
IFB No : NEA/JLDC/2080-082-NCB -05 || Construction of HT/LT Line and Transformer Installation Works
IFB No : NEA/JLDC/2080-082-NCB -06 || Construction of HT/LT Line and Transformer Installation Works Different Place of Jaleshwor
IFB No : l-95 || Neurosurgery Electric Drill
IFB No : NDCL/CTO/ICB/09/080-81 || M/s LOLC Technologies Ltd. sin Lanka
IFB No : NDCL/CTO/ICB/09/080-81 || M/s 4i Apps Solutions Private Limited Indian
IFB No : NDCL/CTO/ICB/09/080-81 || M/s Rostan-Dristi JV Nepal
IFB No : NEA-LPDON-HR-2080/081-10 || जनशक्ति आपूर्ति सम्बन्धि
IFB No : 28/RM/NCB/W/2080/081 || Ammar Shahid Dashrath Chand Ma. Vi. School Building Construction works
IFB No : RA/11/2081/082 || Internal Revenue from River Bed Material at West side area of Sitalpur Bridge at ward no 12,13
IFB No : NA/WDHQ/NCB/Building/081/82/01 || Remaining work of Col. Building G+2 Completion
IFB No : RA/10/2081/082 Internal revenue from River Bed Material at East area of Sitalpur Bridge ward no 12
IFB No : RA/09/2081/082 || Internal Revenue from River Bed Material at Gothuwa Ganar, Babai Nadi- Gwar khola Dovan at ward no 14
IFB No : RA/08/2081/082 || Internal Revenue from River Bed Material at vojpur Ghat area ward no 14
© Copyright Thekkabazar. All Rights Reserved